5
Drawing IX (Exec Order. DAPL)Drawing IX (Burn President Trump's Presidential Memorandum on the construction of the Dakota Access Pipeline, marks not evenly dispersed.)
signed, titled and dated "Drawing IX Exec Order. DAPL 2023 Anna Tsouhlarakis" on the reverse
fire and ash on paper
27 x 41 in. (68.6 x 104.1 cm)
Executed in 2023.
Price On Request